Z Zise Developers 简体中文

Exchange order list, cursor-paginated

GET /v1/exchange/orders scope: exchange:read
On behalf of a member · x-on-behalf-of required

Cursors are opaque strings; do not construct them. Undecodable cursors restart at the beginning rather than error, allowing the next request to recover automatically if our ordering implementation changes.

⚠ Amounts here are integer strings in minor units, such as "500000000", unlike fixed-point strings in POST /v1/exchange/orders, GET /v1/exchange/orders/{id}, and POST /v1/exchange/quotes. This is the only endpoint in this flow using integer strings; do not parse it with the detail endpoint’s parser.

Precision is supplied alongside each row through ledger_scale_from / ledger_scale_to / ledger_scale_fee; insert decimal points yourself. All three are separate: fee denomination depends on direction configuration and need not be inferred from either asset; charging the to side for USDT→USD is common. Reusing either asset’s scale can be wrong for a particular pair.

⚠ Locked quotes not yet executed appear with status: quoted. They are not transactions, expire unused, and move no funds. Filter by status during reconciliation; do not count quoted as executed volume.

Query Parameters

FieldTypeRequiredDescription
limit integer Optional Items per page. Defaults to 20, maximum 100; invalid values fall back to 20.
cursor string Optional next_cursor from the previous page. Opaque string; do not parse or manufacture it.
FieldTypeRequiredDescription
x-on-behalf-of string Required Returns only this member’s exchange orders under your merchant.

Response

200status values: quoted / executing / executed / failed / canceled / reversed, the last being an administrative reversal. Store unknown values unchanged and alert; do not default.
{
  "data": [
    {
      "id": "exc_7a1e5c30-2b44-4c11-9f8e-31d0a7b62c45",
      "status": "executed",
      "from_asset": "USDT",
      "to_asset": "USD",
      "from_amount": "500000000",
      "to_amount": "498750000",
      "rate": "1.0000",
      "fee_asset": "USD",
      "fee_amount": "1250000",
      "ledger_scale_from": 6,
      "ledger_scale_to": 6,
      "ledger_scale_fee": 6,
      "created_at": "2026-08-12T09:30:00Z"
    }
  ],
  "next_cursor": "eyJ2IjoxfQ",
  "has_more": true
}
400member_context_required · member_not_found
403insufficient_scope
Request
curl -X GET 'https://api.zinfra.vip/v1/exchange/orders' \
  -H 'x-auth-token: Bearer $TOKEN' \
  -H 'x-on-behalf-of: $MEMBER_ID'
const res = await fetch("https://api.zinfra.vip/v1/exchange/orders", {
  method: "GET",
  headers: {
    "x-auth-token": "Bearer $TOKEN",
    "x-on-behalf-of": "$MEMBER_ID",
  },
});
// Keep monetary amounts as strings, never numbers.
const data = await res.json();
import requests

res = requests.get(
    "https://api.zinfra.vip/v1/exchange/orders",
    headers={
        "x-auth-token": "Bearer $TOKEN",
        "x-on-behalf-of": "$MEMBER_ID",
    },
)
# Use Decimal(str(...)) for amounts, not float.
data = res.json()
req, _ := http.NewRequest("GET", "https://api.zinfra.vip/v1/exchange/orders",
    nil)
req.Header.Set("x-auth-token", "Bearer $TOKEN")
req.Header.Set("x-on-behalf-of", "$MEMBER_ID")
res, err := http.DefaultClient.Do(req)
// Decode amount fields as string, not float64.
HttpRequest req = HttpRequest.newBuilder()
    .uri(URI.create("https://api.zinfra.vip/v1/exchange/orders"))
    .header("x-auth-token", "Bearer $TOKEN")
    .header("x-on-behalf-of", "$MEMBER_ID")
    .method("GET", HttpRequest.BodyPublishers.noBody())
    .build();
// Use String / BigDecimal for amounts, not double.
$ch = curl_init('https://api.zinfra.vip/v1/exchange/orders');
curl_setopt_array($ch, [
  CURLOPT_CUSTOMREQUEST => 'GET',
  CURLOPT_RETURNTRANSFER => true,
  CURLOPT_HTTPHEADER => [
    'x-auth-token: Bearer $TOKEN',
    'x-on-behalf-of: $MEMBER_ID',
  ],
]);
$res = curl_exec($ch);
// Use bcmath / strings for amounts, not floatval.
200
{
  "data": [
    {
      "id": "exc_7a1e5c30-2b44-4c11-9f8e-31d0a7b62c45",
      "status": "executed",
      "from_asset": "USDT",
      "to_asset": "USD",
      "from_amount": "500000000",
      "to_amount": "498750000",
      "rate": "1.0000",
      "fee_asset": "USD",
      "fee_amount": "1250000",
      "ledger_scale_from": 6,
      "ledger_scale_to": 6,
      "ledger_scale_fee": 6,
      "created_at": "2026-08-12T09:30:00Z"
    }
  ],
  "next_cursor": "eyJ2IjoxfQ",
  "has_more": true
}